Sulkeutuu pian Lähde · Kieli: English

Montenegro · Rakennustyöt

Virallinen kohde · English

Rehabilitation of 9 Tunnels on the Vrbnica–Bar Railway Line, Montenegro

Railway Infrastructure of Montenegro JSC – Podgorica (RIoM) / Željeznička Infrastruktura Crne Gore AD – Podgorica (ŽICG) · Montenegro

Määräaika 24.8.2026 klo 10.00 UTC
Arvioitu arvo13 481 400,76 EUR
Julkaistu30.7.2026
Avaa virallinen ilmoitus ↗

Virallinen tiivistelmä · English

Mitä hankitaan?

Rehabilitation works on nine railway tunnels (T154, T156, T157, T165, T167, T169, T215, T218 and T247) along the Vrbnica–Bar railway line in Montenegro, with a combined length of approximately 2,921.5 metres. The works will be carried out whilst the line remains in commercial operation, in defined daily traffic intervals as set out in the Tender Documents. The Contract is co-financed by the European Investment Bank under the Western Balkans Investment Framework (WBIF) and and is governed by the FIDIC Conditions of Contract for Construction (Red Book), First Edition 1999.

Lähde ja luotettavuus

Lähde: virallinen TED-ilmoitus 528305-2026, tarkistettu viimeksi 21.8.2026 klo 19.08. Alkuperäinen julkaisu on edelleen ratkaiseva.

Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.