Virallinen yhteenveto · English
Mitä hankitaan?
DSB wants to purchase an Electric Shunting Machine (ESM) to support operations at the new workshop nearby the town Næstved (NVO).The machine must be capable of shunting the following train sets: EB (Electrical locomotives) - EC (Talgo-Coaches), EB-DD (Double Decker), ER (electrical multiple units) and DD coaches in and out of the workshop, the under-floor lathe, in the workshop area, in the end of the parking area and the cleaning hall. ESM must be able to couple 6 DD coaches together and press their buffers to ensure the couplings are tightened as much as possible. The ESM must be able to operate both on roads and rail tracks, and it should be simple to switch between these modes of operation. The procurement includes the following: • An Electric Shunting Machine • Service including maint
Suuntaa antava konekäännös. Virallinen yhteenveto on edelleen ensisijainen.
Virallinen yhteenveto · English
DSB wants to purchase an Electric Shunting Machine (ESM) to support operations at the new workshop nearby the town Næstved (NVO).The machine must be capable of shunting the following train sets: EB (Electrical locomotives) - EC (Talgo-Coaches), EB-DD (Double Decker), ER (electrical multiple units) and DD coaches in and out of the workshop, the under-floor lathe, in the workshop area, in the end of the parking area and the cleaning hall. ESM must be able to couple 6 DD coaches together and press their buffers to ensure the couplings are tightened as much as possible. The ESM must be able to operate both on roads and rail tracks, and it should be simple to switch between these modes of operation. The procurement includes the following: • An Electric Shunting Machine • Service including maint
Ilmainen
Saa tämän alan seuraavat tarjouskilpailut
Saat viikoittain sähköpostin uusista hakuehtojasi vastaavista ilmoituksista. Tarkista tai muokkaa ehtoja ennen maksuttoman ilmoitusvahdin käyttöönottoa.
Ilmoitushistoria
Hankintamenettelyn aikajana
Seuraa tähän hankintamenettelyyn liittyviä päävaiheita ja päivityksiä.
Muita tähän liittyviä ilmoituksia ei ole vielä tunnistettu.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.
Lähde ja luotettavuus
TED · 489020-2026. Tarkistettu 23.8.2026 klo 17.05.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.