The scope of the proposed remedial works is summarised briefly as follows: • Site set-up; • Installation of water quality protection measures; • Traffic management; • Site clearance including vegetation clearance from embankments adjacent to the bridge; • Removal of all vegetation and algae from stonework faces; • Graffiti removal; • Cleaning of stonework (specialist mild abrasive blast system appropriate to protected structures); • Masonry Repairs (high quality sympathetic repairs by historic structure specialist mason); • Masonry Repointing of Joints (by historic structures specialist); • Repair of existing concrete scour aprons; • Parapet Balusters (in-situ repairs, surface prep and repainting); • Replacement of Heritage Lamp Standards and Lantern Heads; • Electrical works associated…
Suuntaa antava konekäännös. Virallinen yhteenveto on edelleen ensisijainen.
Virallinen yhteenveto · English
The scope of the proposed remedial works is summarised briefly as follows: • Site set-up; • Installation of water quality protection measures; • Traffic management; • Site clearance including vegetation clearance from embankments adjacent to the bridge; • Removal of all vegetation and algae from stonework faces; • Graffiti removal; • Cleaning of stonework (specialist mild abrasive blast system appropriate to protected structures); • Masonry Repairs (high quality sympathetic repairs by historic structure specialist mason); • Masonry Repointing of Joints (by historic structures specialist); • Repair of existing concrete scour aprons; • Parapet Balusters (in-situ repairs, surface prep and repainting); • Replacement of Heritage Lamp Standards and Lantern Heads; • Electrical works associated…
Ilmoitushistoria
Hankintamenettelyn aikajana
Seuraa tähän hankintamenettelyyn liittyviä päävaiheita ja päivityksiä.
Muita tähän liittyviä ilmoituksia ei ole vielä tunnistettu.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.
Lähde ja luotettavuus
TED · 429669-2026. Tarkistettu 23.8.2026 klo 6.05.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.