Euroopa riigihangete otsing

Riigihangete otsing

Filtreerige kehtivaid teateid riigi, CPV sektori, tähtaja ja eeldatava maksumuse järgi.

tulemust: 3

Aktiivsed võimalused

Ametlikud kirjed
Salvestage see otsing radarinaKord nädalas · esmaspäev 08:00 (Pariis)Kontrollid toimuvad valitud sagedusega. E-kirjad annavad teada Tenderivas saadaolevatest vastavatest uutest teadetest ja olulistest muudatustest. Kohaletoimetamine sõltub ametlike allikate uuendustest ja nende töötlemisest.
Avatud SIMAP XKX

This republication is not an official publication. The data published on www.simap.ch are authoritative.

Kosovo · Naftatooted, kütused, elekter ja energia

Ametlik pealkiri · English

Climate Resilience in the Water Sector of Kosovo: Seed Investment: Installation of a PV System - RWC Hidrodrini

Kosovo Energy Efficiency Fund

Ametlik kokkuvõte · English

The Subject of the Contract is the design, supply, installation, testing, commissioning, and handover of a grid-connected photovoltaic (PV) system at the Main Pumping Station of RWC Hidrodrini, on a turnkey basis.The scope of Works and Services, technical requirements, performance criteria, drawings, and all other obligations of the Contractor are fully defined in the Technical Specifications of the Tender Documents.

Miks see võimalus vastab teie kriteeriumidele
  • Riik vastab teie kriteeriumidele
Tähtaeg
23. okt 2026 10:00 UTC+02:00
Eeldatav maksumus
Teatamata
Avatud SIMAP XKX

This republication is not an official publication. The data published on www.simap.ch are authoritative.

Kosovo · Ehitustööd

Ametlik pealkiri · English

Climate Resilience in the Water Sector of Kosovo: Seed Investment: Supply and Installation of Pump Systems

Kosovo Energy Efficiency Fund

Ametlik kokkuvõte · English

The Subject of the Contract is the rehabilitation and replacement of pumping equipment in existing pumping stations operated by the participating Regional Water Companies.The Works include, but are not limited to:— verification of hydraulic, mechanical, electrical and civil site conditions— detailed engineering and preparation of implementation documents— supply of pumps, motors, hydraulic equipment, valves, instrumentation, electrical and control…

Miks see võimalus vastab teie kriteeriumidele
  • Riik vastab teie kriteeriumidele
Tähtaeg
23. okt 2026 10:00 UTC+02:00
Eeldatav maksumus
Teatamata
Avatud SIMAP XKX

This republication is not an official publication. The data published on www.simap.ch are authoritative.

Kosovo · Ehitustööd

Ametlik pealkiri · English

Climate Resilience in the Water Sector of Kosovo: Seed Investment: Supply, Civil and Installation Works of Water Meters

Ministry of Economy

Ametlik kokkuvõte · English

The Subject of the Contract is supply, installation and related civil works for customer and bulk flow water meters in existing supply networks operated by the participating Regional Water Comapnies. The Works include, but are not limited to:Bulk (production/distribution) flow metering: installation of two electromagnetic flow meters on main distribution pipelines in Ferizaj (RWC Bifurkacioni).Customer metering: relocation and replacement of customer…

Miks see võimalus vastab teie kriteeriumidele
  • Riik vastab teie kriteeriumidele
Tähtaeg
23. okt 2026 10:00 UTC+02:00
Eeldatav maksumus
Teatamata