Επίσημη περίληψη · English
Τι αποτελεί αντικείμενο της σύμβασης;
Sligo County Council (SCC) now requires a suitably qualified geothermal contractor to undertake thermal response testing (TRT) at the Sligo Regional Sports Centre. The principal test borehole is to be a new 200 m grouted vertical borehole heat exchanger that is to be drilled and completed in a manner that facilitates not only the TRT test, but also allows the borehole to be part of the final geothermal collector. This borehole will also require a Distributed Temperature Sensor (DTS) fibre optic cable to be installed to the total depth of the borehole for the purposes of long-term temperature monitoring
Ενδεικτική αυτόματη μετάφραση. Η επίσημη περίληψη παραμένει η έγκυρη αναφορά.
Επίσημη περίληψη · English
Sligo County Council (SCC) now requires a suitably qualified geothermal contractor to undertake thermal response testing (TRT) at the Sligo Regional Sports Centre. The principal test borehole is to be a new 200 m grouted vertical borehole heat exchanger that is to be drilled and completed in a manner that facilitates not only the TRT test, but also allows the borehole to be part of the final geothermal collector. This borehole will also require a Distributed Temperature Sensor (DTS) fibre optic cable to be installed to the total depth of the borehole for the purposes of long-term temperature monitoring
Ιστορικό γνωστοποιήσεων
Χρονολόγιο διαδικασίας σύναψης σύμβασης
Παρακολουθήστε τα κύρια στάδια και τις ενημερώσεις που συνδέονται με αυτή τη διαδικασία σύναψης σύμβασης.
Δεν έχει ακόμη εντοπιστεί άλλη σχετική γνωστοποίηση.
Τα δεδομένα έχουν αναδιαρθρωθεί για ευκολότερη ανάγνωση. Η επίσημη προκήρυξη και τα έγγραφα της σύμβασης υπερισχύουν πάντα.
Πηγή και αξιοπιστία
TED · 470955-2026. Ελέγχθηκε στις 23 Αυγ 2026, 2:05 μ.μ..
Τα δεδομένα έχουν αναδιαρθρωθεί για ευκολότερη ανάγνωση. Η επίσημη προκήρυξη και τα έγγραφα της σύμβασης υπερισχύουν πάντα.