Επίσημη περίληψη · English
Τι αποτελεί αντικείμενο της σύμβασης;
This procurement is for 3 crew vehicles with fire pumps and a water tank. The vehicles shall be the same and shall be delivered in accordance with the current regulations and follow the NS11060-2019 unless otherwise specified in this description. The three vehicles shall be used by MIB as operative crew vehicles on stand-by. The vehicles shall be able to transport crew and necessary input equipment to events in MIB ́s area of responsibility, and at the same time support efforts with an integrated water tank and fire pump (including foam system) as part of the vehicle ́s extinguishing system. The vehicles shall be dimensioned and designed for emergency use, with a double cabin (up to five persons) and systems that ensure safe placement of equipment and a proper working environment.…
Ενδεικτική αυτόματη μετάφραση. Η επίσημη περίληψη παραμένει η έγκυρη αναφορά.
Επίσημη περίληψη · English
This procurement is for 3 crew vehicles with fire pumps and a water tank. The vehicles shall be the same and shall be delivered in accordance with the current regulations and follow the NS11060-2019 unless otherwise specified in this description. The three vehicles shall be used by MIB as operative crew vehicles on stand-by. The vehicles shall be able to transport crew and necessary input equipment to events in MIB ́s area of responsibility, and at the same time support efforts with an integrated water tank and fire pump (including foam system) as part of the vehicle ́s extinguishing system. The vehicles shall be dimensioned and designed for emergency use, with a double cabin (up to five persons) and systems that ensure safe placement of equipment and a proper working environment.…
Ιστορικό γνωστοποιήσεων
Χρονολόγιο διαδικασίας σύναψης σύμβασης
Παρακολουθήστε τα κύρια στάδια και τις ενημερώσεις που συνδέονται με αυτή τη διαδικασία σύναψης σύμβασης.
Δεν έχει ακόμη εντοπιστεί άλλη σχετική γνωστοποίηση.
Τα δεδομένα έχουν αναδιαρθρωθεί για ευκολότερη ανάγνωση. Η επίσημη προκήρυξη και τα έγγραφα της σύμβασης υπερισχύουν πάντα.
Πηγή και αξιοπιστία
TED · 409321-2026. Ελέγχθηκε στις 23 Αυγ 2026, 2:05 π.μ..
Τα δεδομένα έχουν αναδιαρθρωθεί για ευκολότερη ανάγνωση. Η επίσημη προκήρυξη και τα έγγραφα της σύμβασης υπερισχύουν πάντα.