Officielt resumé · English
Hvad indkøbes?
DPC intends to establish a multi-party framework for Port Hydrographic Survey Works, to: a. provide hydrographic, geophysical, and associated marine survey services across DPC’s operational and capital programme requirements; b. support DPC in fulfilling its statutory duties as a client in respect of health and safety coordination during the design process, across a range of civil, structural, marine, building and infrastructure projects throughout the framework term. Framework Members shall be capable of providing, as a minimum, the following survey services whether in-house or through an approved consortium: DPC requires firms with strong health and safety design coordination experience across a range of construction project types, including civil engineering, marine structures, port inf
Vejledende maskinoversættelse. Det officielle resumé er fortsat gældende.
Officielt resumé · English
DPC intends to establish a multi-party framework for Port Hydrographic Survey Works, to: a. provide hydrographic, geophysical, and associated marine survey services across DPC’s operational and capital programme requirements; b. support DPC in fulfilling its statutory duties as a client in respect of health and safety coordination during the design process, across a range of civil, structural, marine, building and infrastructure projects throughout the framework term. Framework Members shall be capable of providing, as a minimum, the following survey services whether in-house or through an approved consortium: DPC requires firms with strong health and safety design coordination experience across a range of construction project types, including civil engineering, marine structures, port inf
Forberedelsesliste
Forbered mit tilbud
Kontroller i de officielle dokumenter. Denne vejledning er ikke en automatisk dokumentanalyse.
- Læs alle dokumenter og ændringer
- Kontrollér deltagelsesbetingelser og krævede dokumenter
- Kontrollér om besøg eller møde er påkrævet
- Gennemgå tildelingskriterier og vægtning
- Kontrollér tilgængelige ressourcer, budget og tidsplan
- Bekræft indsendelsesprocedure og frist
TED · 643815-2026. Kontrolleret 18. sep. 2026 11.05.
https://ted.europa.eu/en/notice/-/detail/643815-2026
Analysér denne bekendtgørelse med AI
Resumé, krav og frister ud fra oplysningerne i denne bekendtgørelse. Udbudsmaterialet bliver ikke læst.
Log ind for at analysereAnalyser af bekendtgørelser og PDF’er bruger samme kvote.
Meddelelseshistorik
Udbudsforløb
Følg de vigtigste faser og opdateringer i dette udbud.
Der er endnu ikke fundet en anden relateret meddelelse.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.
Kilde og pålidelighed
TED · 643815-2026. Kontrolleret 18. sep. 2026 11.05.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.