Officielt resumé · English
Hvad indkøbes?
Iarnród Éireann (IÉ) currently operates and maintains a national GSM-R mobile network which provides driver to CTC communications via on-board GSM-R cab-mobile equipment provided by Siemens Mobility. Currently, GSM-R is in operation on the DART network, with national rollout expected to occur in 2026 on the rest of IE’s fleets. As part of the overall maintenance of the GSM-R mobile network, IÉ carry out monitoring and drive- testing which at present requires IÉ Telecoms personnel to perform this task. The task requires staff to travel onboard IÉ Trainsets with monitoring equipment, which can be both onerous and time consuming. IÉ require the provision of an automated drive-testing and RF monitoring solution that will negate the requirement for staff to travel. To achieve this requirement,
Vejledende maskinoversættelse. Det officielle resumé er fortsat gældende.
Officielt resumé · English
Iarnród Éireann (IÉ) currently operates and maintains a national GSM-R mobile network which provides driver to CTC communications via on-board GSM-R cab-mobile equipment provided by Siemens Mobility. Currently, GSM-R is in operation on the DART network, with national rollout expected to occur in 2026 on the rest of IE’s fleets. As part of the overall maintenance of the GSM-R mobile network, IÉ carry out monitoring and drive- testing which at present requires IÉ Telecoms personnel to perform this task. The task requires staff to travel onboard IÉ Trainsets with monitoring equipment, which can be both onerous and time consuming. IÉ require the provision of an automated drive-testing and RF monitoring solution that will negate the requirement for staff to travel. To achieve this requirement,
Forberedelsesliste
Forbered mit tilbud
Kontroller i de officielle dokumenter. Denne vejledning er ikke en automatisk dokumentanalyse.
- Læs alle dokumenter og ændringer
- Kontrollér deltagelsesbetingelser og krævede dokumenter
- Kontrollér om besøg eller møde er påkrævet
- Gennemgå tildelingskriterier og vægtning
- Kontrollér tilgængelige ressourcer, budget og tidsplan
- Bekræft indsendelsesprocedure og frist
TED · 618906-2026. Kontrolleret 11. sep. 2026 06.05.
https://ted.europa.eu/en/notice/-/detail/618906-2026
Analysér denne bekendtgørelse med AI
Resumé, krav og frister ud fra oplysningerne i denne bekendtgørelse. Udbudsmaterialet bliver ikke læst.
Log ind for at analysereAnalyser af bekendtgørelser og PDF’er bruger samme kvote.
Meddelelseshistorik
Udbudsforløb
Følg de vigtigste faser og opdateringer i dette udbud.
Der er endnu ikke fundet en anden relateret meddelelse.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.
Kilde og pålidelighed
TED · 618906-2026. Kontrolleret 11. sep. 2026 06.05.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.