Officielt resumé · English
Hvad indkøbes?
Statsbygg requests tenders for temporary heating of Botsen.The aim is to establish a reliable and comprehensive system for heat production based on pellets, where the tenderer is responsible for the total responsibility for the energy delivery. Buildings and energy need Property: BotsenHeated building area: approx. 17,000 m² Estimated annual energy consumption: approx. 450,000 kWh Estimated highest energy need per month: approx. 90,000 kWhEseen the highest energy need per hour: 150 kWTur temperature at the connection point must be delivered at minimum 55 degrees for an effect need of 150 kW.The energy shall only be used for heating. The building is currently heated by district heating, which it receives from the existing prison, which is still active. This system will be disconnected from
Vejledende maskinoversættelse. Det officielle resumé er fortsat gældende.
Officielt resumé · English
Statsbygg requests tenders for temporary heating of Botsen.The aim is to establish a reliable and comprehensive system for heat production based on pellets, where the tenderer is responsible for the total responsibility for the energy delivery. Buildings and energy need Property: BotsenHeated building area: approx. 17,000 m² Estimated annual energy consumption: approx. 450,000 kWh Estimated highest energy need per month: approx. 90,000 kWhEseen the highest energy need per hour: 150 kWTur temperature at the connection point must be delivered at minimum 55 degrees for an effect need of 150 kW.The energy shall only be used for heating. The building is currently heated by district heating, which it receives from the existing prison, which is still active. This system will be disconnected from
Forberedelsesliste
Forbered mit tilbud
Kontroller i de officielle dokumenter. Denne vejledning er ikke en automatisk dokumentanalyse.
- Læs alle dokumenter og ændringer
- Kontrollér deltagelsesbetingelser og krævede dokumenter
- Kontrollér om besøg eller møde er påkrævet
- Gennemgå tildelingskriterier og vægtning
- Kontrollér tilgængelige ressourcer, budget og tidsplan
- Bekræft indsendelsesprocedure og frist
TED · 618546-2026. Kontrolleret 11. sep. 2026 06.05.
https://ted.europa.eu/en/notice/-/detail/618546-2026
Meddelelseshistorik
Udbudsforløb
Følg de vigtigste faser og opdateringer i dette udbud.
Der er endnu ikke fundet en anden relateret meddelelse.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.
Kilde og pålidelighed
TED · 618546-2026. Kontrolleret 11. sep. 2026 06.05.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.