Åben Kilde · Sprog: English

Irland · Bygge- og anlægsarbejder

Officielt emne English

Intelligent Transport Systems Equipment Frameworks Generation 2

Land og sektor er oversat; emnet står på originalsproget.

Transport Infrastructure Ireland (TII) · Irland

Frist 4. sep. 2026 11.00 UTC
Anslået værdi42.700.000 EUR
Offentliggjort18. aug. 2026
Åbn officiel meddelelse ↗

Sammenfatning af muligheden

Hvad indkøbes?

Transport Infrastructure Ireland (TII) has a requirement to establish nine framework lots under the TII492 Intelligent Transport Systems Equipment Frameworks Generation 2 programme. Lots 1, 2 and 3A to 3F will support TII’s ITS equipment requirements, while Lot 4 will establish a framework to support local authorities in delivering Periodic School Limit signage in accordance with a Government directive. The proposed framework term is four years. The estimated maximum value is €27 million for Lots 1, 2 and 3A to 3F, and €48 million for Lot 4, giving a total estimated maximum value of €75 million across all lots. Lots 1 – 3A to 3F (TII’s requirement for ITS equipment) Transport Infrastructure Ireland (TII) operates and maintains a network of roadside Intelligent Transport Systems (ITS) equip

Kilde og pålidelighed

Kilde: officiel TED-meddelelse 570006-2026, senest kontrolleret 21. aug. 2026 21.06. Den oprindelige offentliggørelse er fortsat gældende.

Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.