Sammenfatning af muligheden
Hvad indkøbes?
Ringsaker municipality shall construct a new elevated water reservoir at Flåhagen by Nordåsvegen east of the centre of Brumunddal. The new reservoir shall replace the current reservior, which is of older date and has a bad technical condition. The Flåhagen elevated basin supplies the area in Brumunddal, which is lower than the kot 190 south of the River Brumunda. The Flåhagen elevated basin is to be supplied with pumps from Narud waterworks, while pumps at the new reservoir shall supply the further up to the Spikdalen elevated basin in the higher pressure zone. A new arrival shall be established from Nordåsvegen via Testament Road to a new basin, as well as new water pipelines from Mausetvegen to the reservoir and on to the existing Water and Sewage installations at Nordåsvegen. This devel
Kilde og pålidelighed
Kilde: officiel TED-meddelelse 462019-2026, senest kontrolleret 20. aug. 2026 20.05. Den oprindelige offentliggørelse er fortsat gældende.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.