Officielt resumé · English
Hvad indkøbes?
The scope of the Package Boiler Unit (PBU) is not limited to the design, manufacture, assembly, delivery and commissioning of complete packaged boiler units comprising natural gas‑fired boilers, natural gas‑fired generators, associated LPHW systems, control and automation systems, instrumentation, documentation, FAT/SAT, and commissioning support. The scope also incorporates purchasing of heat‑exchangers as part of an integrated natural‑gas pre‑heat system. The following is applicable to the scope of the QS: • GNI may procure all or any part of the Boiler Package Unit and heat-exchangers • For the purposes of compliance with Regulation 97(1)(a) (Modification of contracts during their term) of the Utilities Regulations 2016 GNI may require additional services, works, supplies under the…
Vejledende maskinoversættelse. Det officielle resumé er fortsat gældende.
Officielt resumé · English
The scope of the Package Boiler Unit (PBU) is not limited to the design, manufacture, assembly, delivery and commissioning of complete packaged boiler units comprising natural gas‑fired boilers, natural gas‑fired generators, associated LPHW systems, control and automation systems, instrumentation, documentation, FAT/SAT, and commissioning support. The scope also incorporates purchasing of heat‑exchangers as part of an integrated natural‑gas pre‑heat system. The following is applicable to the scope of the QS: • GNI may procure all or any part of the Boiler Package Unit and heat-exchangers • For the purposes of compliance with Regulation 97(1)(a) (Modification of contracts during their term) of the Utilities Regulations 2016 GNI may require additional services, works, supplies under the…
Gratis
Få de næste udbud i denne branche
Modtag en ugentlig e-mail med nye bekendtgørelser, der matcher dine kriterier. Tjek eller tilpas kriterierne, før du aktiverer din gratis besked.
Forberedelsesliste
Forbered mit tilbud
Kontroller i de officielle dokumenter. Denne vejledning er ikke en automatisk dokumentanalyse.
- Læs alle dokumenter og ændringer
- Kontrollér deltagelsesbetingelser og krævede dokumenter
- Kontrollér om besøg eller møde er påkrævet
- Gennemgå tildelingskriterier og vægtning
- Kontrollér tilgængelige ressourcer, budget og tidsplan
- Bekræft indsendelsesprocedure og frist
TED · 343097-2026. Kontrolleret 22. aug. 2026 10.05.
https://ted.europa.eu/en/notice/-/detail/343097-2026
Analysér denne bekendtgørelse med AI
AI-analyser er tilgængelige med Pro eller Team.
Analyser af bekendtgørelser og PDF’er bruger samme kvote.
Meddelelseshistorik
Udbudsforløb
Følg de vigtigste faser og opdateringer i dette udbud.
Der er endnu ikke fundet en anden relateret meddelelse.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.
Kilde og pålidelighed
TED · 343097-2026. Kontrolleret 22. aug. 2026 10.05.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.