Souhrn příležitosti
Co je předmětem zakázky?
Oslobygg KF has been given the task of establishing a new special department at Hovseter school for pupils with diagnoses within autism spectrum disorders. The total gross area (gross area) is 1,234 m² distributed over two floors as well as a technical roof room. The building shall be constructed from solid wood, with visible wooden surfaces and external aluminium covers and it shall fulfil the requirements for plus house standards. The building shall have robust and adapted systems that meet the target group`s needs. A separate outside area shall be established that shall be integrated in the existing outdoor installations. See the tender documentation Part II - The contract documentation and accompanying annexes for further information on the assignment.
Zdroj a spolehlivost
Zdroj: oficiální oznámení TED 568829-2026, naposledy ověřeno 21. 8. 2026 21:06. Rozhodující zůstává původní zveřejnění.
Data jsou upravena pro snazší čtení. Oficiální oznámení a zadávací dokumentace mají vždy přednost.