Официално резюме · English
Какво се възлага?
This Scheme aims to deliver improved safety, comfort and security for cyclists, pedestrians and the mobility impaired and to encourage an uptake in cycling as a viable and safe commuter / student travel mode. This objective is to be achieved through the delivery of infrastructure, which is designed in compliance with the Cycle Design Manual (CDM), the National Cycle Manual (NCM), the Design Manual for Urban Roads and Streets (DMURS), Safe Routes to School Design Guide, Transport Infrastructure Ireland (TII) Publications and the Traffic Management Guidelines (TMG’s) and through a National Transport Authority (NTA) review process. Phases 1-4 has been completed. NTA funding approval is in place to allow the scheme to progress.…
Машинен превод за ориентация. Официалното резюме остава меродавно.
Официално резюме · English
This Scheme aims to deliver improved safety, comfort and security for cyclists, pedestrians and the mobility impaired and to encourage an uptake in cycling as a viable and safe commuter / student travel mode. This objective is to be achieved through the delivery of infrastructure, which is designed in compliance with the Cycle Design Manual (CDM), the National Cycle Manual (NCM), the Design Manual for Urban Roads and Streets (DMURS), Safe Routes to School Design Guide, Transport Infrastructure Ireland (TII) Publications and the Traffic Management Guidelines (TMG’s) and through a National Transport Authority (NTA) review process. Phases 1-4 has been completed. NTA funding approval is in place to allow the scheme to progress.…
История на обявлението
Хронология на процедурата за възлагане
Проследете основните етапи и актуализации, свързани с тази процедура за възлагане.
Данните са преструктурирани за по-лесно четене. Официалното обявление и документите винаги имат предимство.
Източник и надеждност
TED · 778313-2026. Проверено на 9.11.2026 г., 11:05 ч..
Данните са преструктурирани за по-лесно четене. Официалното обявление и документите винаги имат предимство.