Oħloq radar b’xejn

L-ewwel radar tiegħek, pass pass

Agħżel l-attività tiegħek u l-pajjiż li jinteressak. Ara l-opportunitajiet qabel toħloq ir-radar.

  1. Il-kriterji tiegħek
  2. Riżultati reali
  3. Ir-radar tiegħek
Ibda bil-kumpanija tiegħek

Franza · Mhux obbligatorju: fittex isem, SIREN jew SIRET fid-direttorju pubbliku.

Daħħal il-kriterji tiegħi →

Source : Annuaire des Entreprises · data.gouv.fr ↗

Il-kriterji tiegħek

Ibda b’settur. Żid kelma prinċipali biss biex tillimita t-tfittxija.

Il-kliem ewlieni jitfittxu fit-test uffiċjali bil-lingwa tas-sors. Għal tfittxija indipendenti mil-lingwa, uża l-filtru tas-settur CPV. Daħħal mill-inqas kelma waħda ta’ 3 karattri jew aktar.
L-ebda kard tal-ħlas

Riżultati reali

Dan isib ir-radar tiegħek

2 Opportunitajiet attwali

Avviżi minn sorsi uffiċjali integrati. Il-kopertura tvarja skont il-pajjiż u s-sors; l-avviż uffiċjali jipprevali.

Xogħlijiet ta’ kostruzzjoni il-Kosovo

Qabel toħloq ir-radar, qabbel il-ħtieġa, il-post u l-iskadenza ta’ dawn l-avviżi reali.

Miftuħ SIMAP XKX

This republication is not an official publication. The data published on www.simap.ch are authoritative.

il-Kosovo · Xogħlijiet ta’ kostruzzjoni

Titlu uffiċjali · English

Climate Resilience in the Water Sector of Kosovo: Seed Investment: Supply and Installation of Pump Systems

Kosovo Energy Efficiency Fund

Sommarju uffiċjali · English

The Subject of the Contract is the rehabilitation and replacement of pumping equipment in existing pumping stations operated by the participating Regional Water Companies.The Works include, but are not limited to:— verification of hydraulic, mechanical, electrical and civil site conditions— detailed engineering and preparation of implementation documents— supply of pumps, motors, hydraulic equipment, valves, instrumentation, electrical and control…

Skadenza
23 Ott 2026 10:00 UTC+02:00
Valur stmat
Mhux imħabbar
Miftuħ SIMAP XKX

This republication is not an official publication. The data published on www.simap.ch are authoritative.

il-Kosovo · Xogħlijiet ta’ kostruzzjoni

Titlu uffiċjali · English

Climate Resilience in the Water Sector of Kosovo: Seed Investment: Supply, Civil and Installation Works of Water Meters

Ministry of Economy

Sommarju uffiċjali · English

The Subject of the Contract is supply, installation and related civil works for customer and bulk flow water meters in existing supply networks operated by the participating Regional Water Comapnies. The Works include, but are not limited to:Bulk (production/distribution) flow metering: installation of two electromagnetic flow meters on main distribution pipelines in Ferizaj (RWC Bifurkacioni).Customer metering: relocation and replacement of customer…

Skadenza
23 Ott 2026 10:00 UTC+02:00
Valur stmat
Mhux imħabbar
Ara r-riżultati kollha u rfinahom